Translations:Plan/Engineering To Order project tutorial/planning/112/it: Difference between revisions

From KDE Wiki Sandbox
(Importing a new version from external source)
 
m (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/planning/112/it to Translations:Plan/Engineering To Order project tutorial/planning/112/it without leaving a redirect: Part of translatable page "KPlato/Engineering T...)
 
(No difference)

Latest revision as of 08:00, 11 April 2019

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Plan/Engineering To Order project tutorial/planning)
If distribution is 'None', the tasks estimate is used as is during scheduling. If distribution is 'PERT', the estimate (E) used is calculated based on the entered optimistic- (O), pessimistic-(P) and most likely (M) estimate. The formula used for this is:

Se la distribuzione è 'Nessuna', la stima delle attività viene utilizzata così com'è durante la pianificazione. Se la distribuzione è 'PERT', la stima (E) utilizzata viene calcolata basandosi sulle stime inserite ottimistica- (O), pessimistica-(P) e principale (M). La formula utilizzata è: