Translations:Plan/Engineering To Order project tutorial/planning/95/da: Difference between revisions

From KDE Wiki Sandbox
(Importing a new version from external source)
 
m (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/planning/95/da to Translations:Plan/Engineering To Order project tutorial/planning/95/da without leaving a redirect: Part of translatable page "KPlato/Engineering To...)
 
(No difference)

Latest revision as of 08:00, 11 April 2019

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Plan/Engineering To Order project tutorial/planning)
Let's start to give priority at the tasks in order to obtain a full list of dependencies. This can be done graphically with the mouse, clicking at the right or left side of the task and then drag the relative arrow to the desired position of the other task. It should be better to connect only the tasks and not the summary. The result should be like below.

Lad os starte med at give prioriteter til opgaverne for at kunne få en fuld liste over afhængigheder. Dette kan gøres grafisk med musen ved at klikke på den højre eller venstre side af opgaven og så trække den relative pil til den ønskede side af den anden opgave. Det er nok bedst kun at forbinde opgaverne og ikke resuméerne. Resultatet skal se sådan ud: