Plan/es: Difference between revisions

From KDE Wiki Sandbox
(Created page with "== Características ==")
(Updating to match new version of source page)
 
(3 intermediate revisions by the same user not shown)
Line 40: Line 40:
'''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.
'''Plan''' also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project.


== Links ==
== Hints, Tips and Tutorials ==
 
* [[Special:myLanguage/Plan/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project.
**  [[Special:myLanguage/Plan/Engineering To Order project tutorial/planning|Engineering To Order project tutorial]]: Planning
**  [[Special:myLanguage/Plan/Engineering To Order project tutorial/executing|Engineering To Order project tutorial]]: Executing and Controlling
 
== More Information ==


* [[Special:myLanguage/Plan/Manual|The Plan Handbook]]
* [https://docs.kde.org/trunk5/en/calligraplan/calligraplan/index.html The Plan Handbook]


* [http://www.calligra.org/plan/ The home page of Plan]
* [http://www.calligra.org/plan/ The home page of Plan]
Line 50: Line 56:
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]
* [http://forum.kde.org/viewforum.php?f=203 The Calligra forum]


== Hints, Tips and Tutorials ==
* [https://en.wikipedia.org/wiki/Calligra_Plan Wikipedia]
 
This tutorial was made for '''KPlato''' but it is still valid for '''Plan''':
 
[[Special:myLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''.


[[Category:Office]]
[[Category:Office]]

Latest revision as of 17:39, 31 May 2021

Gestione proyectos con Plan

Plan es una aplicación de gestión de proyectos. Está destinada para gestionar proyectos moderadamente grandes con múltiples recursos.

Características

  • Different types of task dependencies and timing constraints
  • Scheduling of tasks according to network and resource availability
  • Rescheduling from the current state of the project
  • Comparison with original schedule
Project scheduling and analyzes
  • Flexible entry of task progress
  • Detailed progress report
Task progress information
  • User interface optimized for keyboard entry
  • Customizable views and editors
  • Tasks can be organized in a work breakdown structure
  • Resources can be arranged in a resource breakdown structure
Resource breakdown structure
  • managing of costs in a costs breakdown structure


Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.

Hints, Tips and Tutorials

More Information