KPlato/Manual/Definitions: Difference between revisions
(Created page with '{{Construction}} ==Introduction== In project management, terms may be used in different ways in different programs or different companies or project types. Looking at more exhaus...') |
m (fix typos) |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 8: | Line 8: | ||
<span id="Account"></span> | <span id="Account"></span> | ||
;Account | ;Account | ||
:An account is used in a Cost Breakdown Structure ([[#CBS|CBS]]) to represent a place where cost from [[#Task|tasks]] or [[#Resource|resources]] can be | :An account is used in a Cost Breakdown Structure ([[#CBS|CBS]]) to represent a place where cost from [[#Task|tasks]] or [[#Resource|resources]] can be aggregated. | ||
<span id="Allocation"></span> | <span id="Allocation"></span> | ||
;Allocation | ;Allocation | ||
:Tasks are allocated to [[#Resource|Resources]] during the | :Tasks are allocated to [[#Resource|Resources]] during the planning stage of the project. The actual assigment is done during scheduling. Note that assignment is not guaranteed as the resource may not be available. | ||
<span id="Assignment"></span> | <span id="Assignment"></span> | ||
Line 21: | Line 21: | ||
;CBS | ;CBS | ||
:[[#Cost Breakdown Structure|Cost Breakdown Structure]] | :[[#Cost Breakdown Structure|Cost Breakdown Structure]] | ||
<span id="CPI"></span> | |||
;CPI | |||
:Is the Cost Performance Index and is equal to BCWP/ACWP. When this index is below 1, means that you are over budget. If the index is greater than 1 means that the costs are under budget. | |||
<span id="Cost_Breakdown_Structure"></span> | <span id="Cost_Breakdown_Structure"></span> | ||
Line 65: | Line 69: | ||
;Resource Team | ;Resource Team | ||
:A [[#Resource|resource]] team is a resource that consists of a number of other resources. | :A [[#Resource|resource]] team is a resource that consists of a number of other resources. | ||
<span id="SPI"></span> | |||
;SPI | |||
:Is the Schedule Performance Index and is equal to BCWP/BCWS. When this index is below 1, means that you are behind schedule. If the index is greater than 1 means that you are ahead of the schedule. | |||
<span id="Summary_Task"></span> | <span id="Summary_Task"></span> | ||
Line 73: | Line 81: | ||
;Task | ;Task | ||
:Todo | :Todo | ||
<span id="vCard"></span> | |||
;vCard | |||
:vCard is a file format standard for electronic business cards. | |||
<span id="WBS"></span> | <span id="WBS"></span> | ||
Line 83: | Line 95: | ||
{|width="95%" | {|width="95%" | ||
| || ||align="right"|[[KPlato Manual/ | | || ||align="right"|[[KPlato/Manual/Main Work Area|Next]] | ||
|- | |- | ||
| || ||align="right"| | | || ||align="right"|Main Work Area | ||
|} | |} | ||
[[Category:Office]] | [[Category:Office]] |
Latest revision as of 16:31, 25 November 2010
Under Construction
This is a new page, currently under construction!
Introduction
In project management, terms may be used in different ways in different programs or different companies or project types. Looking at more exhaustive project management glossaries, one will find alternative definitions for most terms.
This list defines how certain terms are used in KPlato.
Terms
- Account
- An account is used in a Cost Breakdown Structure (CBS) to represent a place where cost from tasks or resources can be aggregated.
- Allocation
- Tasks are allocated to Resources during the planning stage of the project. The actual assigment is done during scheduling. Note that assignment is not guaranteed as the resource may not be available.
- Assignment
- Tasks are assigned to Resources during scheduling.
- CPI
- Is the Cost Performance Index and is equal to BCWP/ACWP. When this index is below 1, means that you are over budget. If the index is greater than 1 means that the costs are under budget.
- Cost Breakdown structure
- The CBS organizes accounts into a structure to enable cost to be aggregated independent of the WBS and RBS.
- Estimate
- The estimate is the expected amount of effort or time needed to complete a task.
- Milestone
- Todo
- Program Evaluation and Review Technique
- TODO
- PERT Distribution
- A simplified way to calculate Expected estimate from Optimistic-, Most Likely- and Pessimistic estimate.
- Resource Breakdown Structure
- The RBS organizes resources into resource groups.
- Resource
- A resource can be of type Work, Material or Team. A resource must always belong to a Resource Group.
- Resource Group
- A resource group is used to group similar resources.
- Resource Team
- A resource team is a resource that consists of a number of other resources.
- SPI
- Is the Schedule Performance Index and is equal to BCWP/BCWS. When this index is below 1, means that you are behind schedule. If the index is greater than 1 means that you are ahead of the schedule.
- Summary Task
- Todo
- Task
- Todo
- vCard
- vCard is a file format standard for electronic business cards.
- Work Breakdown Structure
- The WBS is used to break down large projects into manageable chuncks to ease planning and management.
Next | ||
Main Work Area |