KPlato/Manual/Resource Editor: Difference between revisions
(Add images, describe data) |
mNo edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 40: | Line 40: | ||
==Editing data== | ==Editing data== | ||
Data can be edited inline as described [[KPlato Manual/Using the Views|here]]. | Data can be edited inline as described [[KPlato/Manual/Using the Views|here]]. | ||
Resources can also be edited using the [[KPlato Manual/Resource Settings Dialog|resource settings dialog]]. | Resources can also be edited using the [[KPlato/Manual/Resource Settings Dialog|resource settings dialog]]. | ||
The following columns are displayed as default: | The following columns are displayed as default: | ||
Line 77: | Line 77: | ||
|- | |- | ||
| Account | | Account | ||
| The | | The account where the resource cost is accumulated. | ||
|} | |} | ||
Line 89: | Line 89: | ||
|} | |} | ||
---- | |||
{| | {| | ||
|width="70%"| | |width="70%"| |
Latest revision as of 07:51, 9 September 2010
Under Construction
This is a new page, currently under construction!
Description
The Resource Editor is used to create, edit, and delete resources and resource groups. Resources must belong to a resource group. At the moment sub-groups are not allowed. |
Working resources must refere to a calendar that defines the working hours for the resource. Calendars are created using the Work and Vacation Editor.
Material resources is by default always available. You can use a calendar to limit its availability.
Toolbar
The toolbar provides the means to create and delete resources and resource groups:
Button | Short cut | Description |
Add Resource Group | Ctrl+I | Button to create a resource group. The new group is appended at the end of the groups. |
Add Resource | Ctrl+Shift+I | Button to create a resource. The new resource is appended as a child to the currently selected group. If a resource is selected, the new resource is appended to its parent group. |
Delete | Delete | Deletes the selected resources and/or resource groups. |
Resources can be created by dropping data from any application that supports dragging vCard information, like KAddressBook or Evolution.
Resources can be copied or moved to a different resource group using drag-and-drop.
Note
When moving a resource, the resource will loose any allocations.
Editing data
Data can be edited inline as described here. Resources can also be edited using the resource settings dialog.
The following columns are displayed as default:
Column | Description |
Name | The name of the resource or resource group. |
Type | The type of the resource or resource group. |
Initials | The initials of the resource. |
The e-mail address of the resource. | |
Calendar | The calendar defines when the resource is working. |
Limit (%) | The maximum load that can be assigned. |
Available From | Defines when the resource is available to the project. |
Available Until | Defines when the resource is available to the project. |
Normal Rate | The cost pr hour, normal hours. |
Account | The account where the resource cost is accumulated. |
Configuration
Next | |
Work and Vacation Editor |