Plan/da: Difference between revisions
(Updating to match new version of source page) |
(Updating to match new version of source page) |
||
Line 38: | Line 38: | ||
Plan also comes with a companion; [[PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project. | Plan also comes with a companion; [[Special:myLanguage/PlanWork|PlanWork]] that is designed to assist with work flow and information flow during execution of the project. | ||
== Links == | == Links == | ||
Line 54: | Line 54: | ||
This tutorial was made for KPlato but it is still valid for Plan: | This tutorial was made for KPlato but it is still valid for Plan: | ||
[[KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''. | [[Special:myLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''. | ||
[[Category:Kontor/da]] | [[Category:Kontor/da]] |
Revision as of 17:08, 14 December 2011
Håndtér projekter med Plan |
Plan er et projektstyringsprogram. Det er beregnet til styring af moderat store projekter med et antal ressourcer.
Hovedtræk
- Forskellige typer af opgaveafhængigheder og tidsbegrænsninger
- Planlægning af opgaver i overensstemmelse med tilgængelighed af netværk og ressourcer
- Ændring af planen med udgangspunkt i projektets aktuelle status
- Sammenligning med den oprindelige plan
- Fleksibel angivelse af opgavefremskridt
- Detaljeret fremskridtsrapport
- Brugerflade optimeret til brug af tastatur
- Konfigurerbare visninger og editorer
- Opgaver kan organiseres i en arbejdsfordelingsstruktur
- Ressourcer kan ordnes i en ressourcefordelingsstruktur
- Styring af omkostninger i en omkostningsanalysestruktur
Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.
Links
Hints, Tips and Tutorials
This tutorial was made for KPlato but it is still valid for Plan:
Engineering To Order project tutorial is a step-by-step walk-through setting up and executing a project using KPlato.