Plan/es: Difference between revisions

From KDE Wiki Sandbox
(Created page with "== Características ==")
(Updating to match new version of source page)
Line 51: Line 51:


== Hints, Tips and Tutorials ==
== Hints, Tips and Tutorials ==
* [[Special:myLanguage/Plan/Tutorials|Tutorials]]


This tutorial was made for '''KPlato''' but it is still valid for '''Plan''':
[[Special:myLanguage/KPlato/Engineering To Order project tutorial|Engineering To Order project tutorial]] is a step-by-step walk-through setting up and executing a project using '''KPlato'''.


[[Category:Office]]
[[Category:Office]]

Revision as of 16:10, 10 April 2019

Gestione proyectos con Plan

Plan es una aplicación de gestión de proyectos. Está destinada para gestionar proyectos moderadamente grandes con múltiples recursos.

Características

  • Different types of task dependencies and timing constraints
  • Scheduling of tasks according to network and resource availability
  • Rescheduling from the current state of the project
  • Comparison with original schedule
Project scheduling and analyzes
  • Flexible entry of task progress
  • Detailed progress report
Task progress information
  • User interface optimized for keyboard entry
  • Customizable views and editors
  • Tasks can be organized in a work breakdown structure
  • Resources can be arranged in a resource breakdown structure
Resource breakdown structure
  • managing of costs in a costs breakdown structure


Plan also comes with a companion; PlanWork that is designed to assist with work flow and information flow during execution of the project.

Links

Hints, Tips and Tutorials