Revision as of 08:00, 11 April 2019 by FuzzyBot (talk | contribs) (FuzzyBot moved page Translations:KPlato/Engineering To Order project tutorial/planning/78/it to Translations:Plan/Engineering To Order project tutorial/planning/78/it without leaving a redirect: Part of translatable page "KPlato/Engineering To...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

La stima è il tempo necessario per completare l'attività, può essere in differenti unità: o (ore), g (giorni), s (settimane) e M (mesi).