Translations:Plan/Engineering To Order project tutorial/planning/77/en

From KDE Wiki Sandbox

On the General tab insert the name of the task, you can choose a responsible person if needed, then define the timing and the risk associated to the task. The schedule type is typical for planning, "as soon as possible" is the most used. Other kind of type, generate a need to compile the date and time on the right of the drop-down menu.