Translations:Plan/Engineering To Order project tutorial/planning/95/en

From KDE Wiki Sandbox

Let's start to give priority at the tasks in order to obtain a full list of dependencies. This can be done graphically with the mouse, clicking at the right or left side of the task and then drag the relative arrow to the desired position of the other task. It should be better to connect only the tasks and not the summary. The result should be like below.